PLAN REVIEW FEE SCHEDULE
PRE-PLAN SUBMITTAL CONSULTATION
· $50.00 PER HOUR, WITH A TWO HOUR MINIMUM.
·
$250.00 Development/Access Plan.
FIRE
HYDRANT/WATER MAIN PLAN REVIEW-FLOW TEST INSPECTION REQUIRED
NOTE: It is the developer’s responsibility to schedule with the water department for a hydrant flow test on new and existing hydrants. The fire department must be present to see the flow test done. Construction plan approvals will be denied if a flow test is not done. Please see hydrant submittal guidelines for more information.
· $500.00 Water Plan.
FIRE
SPRINKLER SUPPRESSION SYSTEM PLAN REVIEW
THREE INSPECTIONS REQUIRED
NOTE: The three inspections required for sprinklers/suppression systems: hydrostatic/flush, rough in visual, and a final. If any of the inspection approvals are denied, additional inspections will be provided at a rate of $50.00 per hour, two hour minimum.
· 0-100 devices- $500.00
· 101-200 devices- $600.00
· 201 or more devices- $700.00
· For each additional floor above the first floor, an additional $100.00
· For each additional riser after the first riser, and additional $100.00
· Fire Pump( per pump)- $350.00 will be added to the fire sprinkler review fee.
· FEES FOR NFPA-13D and NFPA 13R SYSTEMS: Unlimited devices- $325.00
FIRE
ALARM/ DETECTION SYSTEM PLAN REVIEW- 2 INSPECTIONS REQUIRED
NOTE: The two inspections for alarm detection systems will be for a rough inspection and final. If any of the inspection approvals are denied, additional inspections will be provided at a rate of $50.00 per hour, two hour minimum.
· 0-50 devices( smoke detectors ,pull stations, horn and strobe)- 500.00
· 51-100 devices- $550.00
· 101 or more devices- $650.00
KITCHEN HOOD SYSTEMS- ONE FINAL INSPECION REQUIRED
·
$250.00 for the first hood system
·
$100.00 for any additional.
CONSTRUCTION/LIFE SAFETY PLAN REVIEW- ONE FINAL INSPECTION REQUIRED
CONSTRUCTION REVIEW FEES FOR NEW
STRUCTURES.
Example: 6,000 sq ft plan review- 5,000 sqft. max with additional 1,000sqft.
TOTAL= $600.00
PLAN REVIEW FOR EXISTING STRUCTURE/
REMODELS/ KITCHEN HOODS
HAZMAT PLAN REVIEW
NOTE: All Hazmat Plan Reviews will be reviewed by a third party.
· $500.00 will be added onto the construction/ life safety review fee. This will include new construction and existing facility with per process/use modification.
· Tanks- AST/UST, petroleum and other: $300 (up to 2 tanks), and $100 per additional tank
·
Explosives/Blasting: $300
·
PERMITS
(permit-plan review is only good for one year). Inspection to be completed by
Security Fire Department.
HIGH PILE STORAGE
·
$500.00 will be added
onto the construction/ life safety review fee.
GENERAL INFORMATION
·
Be
sure to read all Security Fire Protection District guidelines regarding
construction submittals, hydrant submittals.
·
When
plans are dropped off, fire department must have a hard copy for their records,
and a copy of the plans must be provided in a PDF format either by email
or cd/disc.
·
All
PLAN REVIEWS when dropped off must fill out application form in its entirety.
·
ALL
PLAN REVIEWS will get ONE FREE DENIAL. Thereafter, each denied
plans will be charged double the
original fee till the plans meet approval.
· If the final inspection fails or if more than one inspection is needed, there will be a $50.00 hourly rate charge applied.
· If the developer wants an inspection done on off duty time a $50.00 hourly rate will apply.
· All fees will be paid in full at the final pick up of the approved plans.